Advertisment
Kuranda
Bridge’s two lanes re-open
THE Barron River Bridge at Kuranda has re-opened to two lanes with a 42.5 tonne load limit.
27 September, 2024
Advertisment
THE Barron River Bridge at Kuranda has re-opened to two lanes with a 42.5 tonne load limit.
27 September, 2024